After 4 days of L and I working on the foundation, we are ready for backfill. What a load of hard work!

We will start backfilling on Wednesday July, 13th, but I still need to put together the drain tile (french drain) as well as drain pipe to route rain gutter drainage underground.

We will not back fill the north foundation wall, which is 58 feet long, until the floor joists are in place to help support the wall and not allow the pressure from the soil to warp the wall. The area around the window

Foundation ready for backfill.

Foundation ready for backfill.

Finish grade slop at front of house.

Finish grade slop at front of house.

L after a really hard days work!

L after a really hard days work!

wells will only get filled to the bottom as well, since I still have to build them out of steel plate.

Advertisements
Uncategorized

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s